Doe Run http://news.stlpublicradio.org en Bill Sent To Mo. Gov. Nixon Would Cap Lead Contamination Punitive Damages http://news.stlpublicradio.org/post/bill-sent-mo-gov-nixon-would-cap-lead-contamination-punitive-damages <p></p><p>One of two bills that would limit punitive damages in lead contamination cases is on its way to <a href="http://gov.mo.gov/">Governor Jay Nixon</a> (D).</p> Thu, 16 May 2013 10:18:21 +0000 Marshall Griffin 26446 at http://news.stlpublicradio.org Bill Sent To Mo. Gov. Nixon Would Cap Lead Contamination Punitive Damages Former Doe Run subsidiary criticized for smelter pollution in Peru http://news.stlpublicradio.org/post/former-doe-run-subsidiary-criticized-smelter-pollution-peru <p><strong><em>Updated 1:20 p.m. August 1 with reopening of smelter</em></strong></p><p>The Doe Run Peru smelter in La Oroya, which had been clsoed due to financial and environmental compliance issues since 2009, resumed zinc processing operations over the weekend.</p><p>Peru&#39;s Minister of Energy and Mines, Jorge Merino Tafur, is reported to have said that lead smelting would also resume in the not too distant future. Restarting copper production would likely take longer, since that would require building a plant to control sulfuric acid emissions.</p><p>Doe Run Peru is owned by the Renco Group, which also owns the St. Louis-based Doe Run Resources Corporation. The metal smelting companies in Missouri and Peru have operated independently since 2007.</p><p> Wed, 01 Aug 2012 18:29:50 +0000 Véronique LaCapra 4148 at http://news.stlpublicradio.org Former Doe Run subsidiary criticized for smelter pollution in Peru Doe Run: no new plant to replace Herculaneum lead smelter http://news.stlpublicradio.org/post/doe-run-no-new-plant-replace-herculaneum-lead-smelter <p><iframe frameborder="0" height="350" marginheight="0" marginwidth="0" scrolling="no" src="http://maps.google.com/maps?oe=utf-8&amp;client=firefox-a&amp;ie=UTF8&amp;q=herculaneum+missouri+smelter+address&amp;gl=us&amp;hq=smelter&amp;hnear=Herculaneum,+Jefferson,+Missouri&amp;hl=en&amp;view=map&amp;source=embed&amp;t=h&amp;cid=15001817900879675996&amp;ll=38.270465,-90.373964&amp;spn=0.023585,0.036478&amp;z=14&amp;iwloc=A&amp;output=embed" width="425"></iframe><br /><small><a href="http://maps.google.com/maps?oe=utf-8&amp;client=firefox-a&amp;ie=UTF8&amp;q=herculaneum+missouri+smelter+address&amp;gl=us&amp;hq=smelter&amp;hnear=Herculaneum,+Jefferson,+Missouri&amp;hl=en&amp;view=map&amp;source=embed&amp;t=h&amp;cid=15001817900879675996&amp;ll=38.270465,-90.373964&amp;spn=0.023585,0.036478&amp;z=14&amp;iwloc=A" style="color: rgb(0, 0, 255); text-align: left; ">View Larger Map</a></small></p><p>Doe Run announced today that it will not build a new lead processing plant in Herculaneum.</p><p>In 2010, the largest lead producer in North America announced it would close its existing lead smelter in Herculaneum by the end of 2013.</p><p>The company had proposed to build a new facility there that would use new technology to reduce emissions of air pollutants including lead and sulfur dioxide.</p><p>But now Doe Run says that won&rsquo;t happen.</p><p> Fri, 29 Jun 2012 18:00:56 +0000 Véronique LaCapra 4017 at http://news.stlpublicradio.org Mo. Atty. Gen. Koster reaches settlement with Doe Run for lead cleanup http://news.stlpublicradio.org/post/mo-atty-gen-koster-reaches-settlement-doe-run-lead-cleanup <p>Attorney General Chris Koster has filed <a href="http://www.scribd.com/doc/90411856/Doe-Run-Consent-Decree-4-12-12#fullscreen">a consent decree</a> to address environmental violations at Doe Run&rsquo;s Sweetwater Mine and Mill in Reynolds County.</p><p>Here&#39;s a map detailing the approximate location of the mine near Ellington, Mo.:</p> Fri, 20 Apr 2012 19:39:33 +0000 Véronique LaCapra 3541 at http://news.stlpublicradio.org Mo. Atty. Gen. Koster reaches settlement with Doe Run for lead cleanup Production to halt for weeks at fire-damaged Doe Run smelter http://news.stlpublicradio.org/post/production-halt-weeks-fire-damaged-doe-run-smelter <p><iframe frameborder="0" height="350" marginheight="0" marginwidth="0" scrolling="no" src="http://maps.google.com/maps?oe=utf-8&amp;client=firefox-a&amp;ie=UTF8&amp;q=herculaneum+missouri+smelter+address&amp;gl=us&amp;hq=smelter&amp;hnear=Herculaneum,+Jefferson,+Missouri&amp;hl=en&amp;view=map&amp;source=embed&amp;t=h&amp;cid=15001817900879675996&amp;z=14&amp;iwloc=A&amp;output=embed" width="425"></iframe><br /><small><a href="http://maps.google.com/maps?oe=utf-8&amp;client=firefox-a&amp;ie=UTF8&amp;q=herculaneum+missouri+smelter+address&amp;gl=us&amp;hq=smelter&amp;hnear=Herculaneum,+Jefferson,+Missouri&amp;hl=en&amp;view=map&amp;source=embed&amp;t=h&amp;cid=15001817900879675996&amp;z=14&amp;iwloc=A" style="color:#0000FF;text-align:left">View Larger Map</a></small></p><p>The Doe Run Co. says production of primary lead&nbsp;at its smelter in the eastern Missouri town of Herculaneum will be&nbsp;suspended for four to six weeks following a fire.</p><p>The fire on March 20 occurred at the smelter&#39;s electric&nbsp;substation. Doe Run Primary Smelting Division general manager Gary&nbsp;Hughes says damage to the substation is significant.</p><p> Thu, 29 Mar 2012 15:05:38 +0000 The Associated Press and Kelsey Proud 3379 at http://news.stlpublicradio.org