Wildwood | St. Louis Public Radio

Wildwood

Volunteer carpenters from Builder's Bloc frame the new home in Wildwood on September 29, 2018.
Shahla Farzan | St. Louis Public Radio

The tap of Mike Wheeler’s hammer echoes through the forest, as he helps frame the walls of a new home in Wildwood.

Wheeler is one of a dozen carpenters volunteering to build a home for a returning veteran and his family. The project, which began in August, is the culmination of a years-long effort to provide a mortgage-free home for U.S. Army veteran and St. Louis native Heath Howes, who was severely wounded while serving in Afghanistan.

The location of the Ellisville Superfund site. The Callahan Subsite is a section of the Ellisville site as a whole.
Screen capture | EPA.gov

The Environmental Protection Agency has again attempted to assure the city of Wildwood that a former toxic dumping site is now safe. However, local officials are still not convinced. 

(photo courtesy of the Missouri Department of Transportation)

The Missouri Department of Transportation has shut down a mile-long stretch of Route 109 in Wildwood to make emergency repairs to a crumbling hillside.

The department was planning to do the construction during the summer months, says district engineer Ed Hassinger. They've been watching the stretch of road between Turkey Track and Christy for the last couple of years.