Martin Luther King Bridge | St. Louis Public Radio

Martin Luther King Bridge

The Martin Luther King Jr. Bridge, built in 1951, is a major thoroughfare connecting Illinois and downtown St. Louis.
Sarah Kellogg | St. Louis Public Radio

The Martin Luther King Jr. Bridge will be closed for a year, beginning Monday.

Both directions of the bridge over the Mississippi River, connecting St. Louis and East St. Louis,  will be shut down as a part of a construction project led by the Illinois Department of Transportation. The $24.3 million project includes the demolition and replacement of a smaller, nearby bridge that spans I-55 and I-64.

Martin Luther King Bridge closes Monday for repairs

Jul 19, 2015
Martin Luther King Bridge connects Illinois and downtown St. Louis. It was built in 1951.
Sarah Kellogg | St. Louis Public Radio

Traffic over the Mississippi River to and from downtown St. Louis is being redirected again. The Martin Luther King Bridge closes for repairs Monday at 9 a.m. It will remain closed for at least four months.

The Illinois Department of Transportation originally planned to close MLK Bridge on July 6, but held off until the Missouri Department of Transportation reopened all lanes of the Poplar Street Bridge.